The contract consist of Design , detailed Engineering , Procurement , Pipe coating , Onshore Fabrication , Transportation of Fabricated Structures, Offshore Installation, Commissioning, Production and performance testing of the following :
Soroosh Wellhead Platfrom SWP-2 topsid
Soroosh 75 bed Living Quarters Platfrom ( SL Q) substructure and topside
Soroosh Production Platform 1 (SPP-1) substructure and topside
Soroosh production Platform 2 ( SPP-2) substructure and topsides
Bridge Links 3 Nos. (SLQ to SWP-2 , SWP.-1 to SPP – 1 and SPP -1 to SPP-2
16” Diameter pipeline from sWP-2 to SPP-1 and subsea cable
Nowrooz Wllhead /production platform 2 ( NPP-2) substructure and topsides
Nowrooz 35 bed Living Quarter s platform ( NLQ)substructure and topsides
Nowrooz Wellhead Platform 1 ( NWP-1) topsides
A bridge link between NLQ and NPP-2
18” Diameter Pipeline from NWP-1 to NPP-2 and riser tie – ins
Connection of Pipeline from SPP-1 to FSU via riser on SPP-1 upto 2500 ton