Location: The Drood oilfield, 3 km from the Kharg Island, the Persian Gulf
Client: Iranian Offshore Oil Company (IOOC)
Contract Type: EPCI
Brief Summary: NSQ has been awarded a contract for engineering, procurement, construction and installation of a wellhead platform (D22), subsea cables, subsea pipelines and related onshore works. The detailed SOW as below:
Jacket:
Water depth: 45.4 m
Jacket height: 52 m
No. of legs: 4
Approximate weight: 1,835 tonnes
Installation method: lifting
Topside:
Structural weight: 600 tons
Approximate total weight: 1,200 tons
No. of decks: 5
Crane capacity: 15 tonnes
Topside type: unmanned
Cables:
Approximate Subsea length: 7,000 m
Approximate onshore length: 4,000 m
Cable size: 300 mm²
No. of cables: 2
Pipelines:
Approximate Subsea length: 10,500 m
Approximate onshore length: 5,000 m
Sizes: 6, 8, 10 inches
No. of pipelines: 3